§ 15-54. Extension of existing service.  


Latest version.
  • All building permit applications shall be reviewed by the public works manager, and a determination shall be made by the public works manager whether any proposed enlargement, addition or expansion of water using facilities can adequately be served by the existing water connection. Such determination shall be made by application of the Town of Bayfield Infrastructure Design Standard and Town of Bayfield Construction Specifications. If the public works manager determines that a larger service is required, the person proposing such expansion shall be required to have the enlarged connection and meter installed at his sole expense. Any extension of service, whether or not a larger service is required, shall include the installation of an additional meter on such enlarged use. Any new meter installation shall be done in accordance with Town of Bayfield Infrastructure Design Standard and Town of Bayfield Construction Specifications provided that the person making an expanded tap connection shall pay the then established cost for the required tap size less credit for the then established cost for the existing tap connection. Any determination made by the public works manager hereunder shall be subject to review by the board of trustees upon written request by the person seeking review of the decision.

(Ord. No. 211, 3-6-90; Ord. No. 374, § 4, 12-4-12)