All building permit applications shall be reviewed by the public works manager, and
a determination shall be made by the public works manager whether any proposed enlargement,
addition or expansion of water using facilities can adequately be served by the existing
water connection. Such determination shall be made by application of the Town of Bayfield
Infrastructure Design Standard and Town of Bayfield Construction Specifications. If
the public works manager determines that a larger service is required, the person
proposing such expansion shall be required to have the enlarged connection and meter
installed at his sole expense. Any extension of service, whether or not a larger service
is required, shall include the installation of an additional meter on such enlarged
use. Any new meter installation shall be done in accordance with Town of Bayfield
Infrastructure Design Standard and Town of Bayfield Construction Specifications provided
that the person making an expanded tap connection shall pay the then established cost
for the required tap size less credit for the then established cost for the existing
tap connection. Any determination made by the public works manager hereunder shall
be subject to review by the board of trustees upon written request by the person seeking
review of the decision.